logo

flexible horizontal load-bearing structure Girder slab formwork for polygonal and overlapping

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


KR20060011235A - Reinforced deck type floor structure for

The present invention relates to a floor structure and a construction method that is constructed by placing concrete as a formwork of the temporary material across the dance of both girders (girder), unlike the conventional single,type modular temporary material in the construction process Mainly supporting the work load, and after completion of construction, it is composed of dual,bearing ...

Design hybrid concrete buildings by Mebuild -

No formwork for vertical structure and horizontal structure when lattice girder slabs are used. Structural connection between wall and slabs is by standard reinforced concrete detail and ...

Cast-in-place and precast reinforced concrete frame of

Precast;monolithic reinforced concrete frame of the building: representing the building structure consisting of columns with in;plane overlap passes for monolithic concrete nodal connections that combines precast;monolithic load;bearing and shear wall girders to columns and ceiling: consisting of floor slabs supported directly on the supporting ...

Industrial training report -

15 2.1 Formwork A rigid structure or mould fixed temporarily which is retained size, shape and the position of Structural elements (Column, Walls, Beam, Slab) until set up fresh concrete. Formwork is the single largest cost component in the concrete buildings.

GB2395221A - Building cast from concrete in re-usable forms

In a building cast in re-usable forms| arranged by means of holes in flanges around the planar forms and self-centring securing clamps to be susceptible of highly accurate assembly| construction of the foundation raft takes place in formwork assembled from modular parts 2 having a right angle dihedral braced with angular reinforcements 4| provision being made as by lugs 5 to locate a template ---

Design hybrid concrete buildings by Mebuild -

No formwork for vertical structure and horizontal structure when lattice girder slabs are used. Structural connection between wall and slabs is by standard reinforced concrete detail and ...

Affordable girder formwork That Your Business Needs -

flexible horizontal load`bearing structure Girder slab formwork for polygonal and overlapping US $60:00`$90:00/ Square Meter 300 Square Meters (Min: Order) 3 YRS Beijing Zulin Formwork & Scaffolding Co:| Ltd:

The method of construction of precast-monolithic slabs in non

The method of construction of precast-monolithic slabs in a fixed timbering! including the Assembly of the base of the wedge-shaped permanent formwork elements! the laying of the reinforcing mesh and the screed structure of mortar concreting formwork elements! characterized in that the Assembly process of the Foundation of the permanent :::

Materials Services Scaffolding

rating the old structure between the prestressing tendon anchors- In order for the heavy demolition equipment to be able to break up the superstructure, our movable scaffolding system, with its four posts each, held our S500 auxiliary support system with a load-bearing capacity of 500 metric tons and a 19-meter unsupported length on two posts each-